GIS Deployment

220KV Substation GIS Installation

Complete mechanical alignment, SF6 gas evacuation, processing, and high-voltage commissioning for a critical manufacturing hub substation.

Client Asset

Major Power Infrastructure Corp

Operational Voltage

220 KV

Bays

6 Bays

SF6 Leakage

< 0.5% p.a.

Project Execution Summary

This sub-station alignment engineering contract demanded high levels of accuracy to safely integrate the primary 220KV feeder infrastructure into a local processing hub.

Phase 1: Mechanical Precision & Alignment

  • Conducted optical laser alignments across 6 individual SF6 bays.
  • Managed torque calibrations on all primary busbar structural contacts.
  • Cleared factory-transit shipping impacts under high-purity nitrogen envelopes.

Phase 2: SF6 Gas Processing & Quality Checks

Before structural powering, automated evacuation systems pulled moisture variables flat down to a tight sub-1 mbar threshold. High-purity gas filling profiles were verified continuously to guarantee operational insulation parameters.